Here are the key developers and operators involved in the growth of Johor’s data‑center ecosystem in Malaysia:



? Major Developers & Operators in Johor

YTL Data Center Holdings (YTL DC / YTL Power)
• Leading developer of the YTL Green Data Center Park in Kulai, Johor, a flagship 500 MW hyperscale campus supported by on-site solar power, with Phase 1 (~72 MW) launched in Q4 2023–early 2024, co-developed with Sea Ltd. 

Telekom Malaysia & Singtel (Nxera)
• The TM–Nxera joint venture broke ground in July 2024 on a 64 MW AI‑ready data‑center campus in Iskandar Puteri, scalable up to 200 MW, LEED-certified and using liquid cooling for high‑density workloads. Target commercial operations by 2026 .

Yondr Group
• Amsterdam‑based Yondr acquired ~73 acres in Sedenak Tech Park (Iskandar/Kulai) to build a 200 MW hyperscale campus, with Phase 1 scheduled for delivery in 2024 .

BrightRay (DC‑Science)
• Malaysian modular data‑center specialist BrightRay commissioned MY‑01, a 90‑MW campus in Sedenak Tech Park in May 2025. It’s the first of three planned facilities, delivered within eight months using prefab modular design .

STT GDC (and affiliate GDS)
• STT GDC is building a 120 MW campus in Nusa Cemerlang Industrial Park (Johor) with expectations to complete the first 16 MW building by 2025.
• Its affiliate GDS is also active in Johor through developments at Nusajaya Tech Park and part of YTL’s Green Park .

ESR‑Logos / UEM Sunrise
• A partnership between Logos Infrastructure (ESR) and UEM Sunrise is developing a potential 350+ MW data‑centre campus in Gerbang Nusajaya, Johor. The collaboration leverages UEM’s landbank and is backed by state agencies .

Stack (US hyperscaler)
• Stack is developing a 220 MW Johor Bahru campus (first phase ~120 MW, second ~100 MW), expected online by Q4 2026. It’s the largest project in Stack’s Asia‑Pacific portfolio .

ZData (Chinese firm)
• ZData Technologies has acquired ~38 acres in Gelang Patah for a new data‑center project expected by late 2025. Additional land deals also underway .



? Summary Table

Developer / JV Location Planned Capacity Status / Timeline
YTL DC / Sea Ltd. Kulai (Green Park) 500 MW total Phase 1 (72 MW) live Q4 2023–2024
TM–Nxera (TM + Singtel) Iskandar Puteri 64 → up to 200 MW Ground broken mid‑2024; full scale by 2026
Yondr Group Sedenak Tech Park 200 MW Phase 1 in 2024
BrightRay (DC‑Science) Sedenak Tech Park 90 MW MY‑01 live May 2025
STT GDC / GDS Nusa Cemerlang / Nusajaya 120 MW+ First building by 2025
ESR‑Logos / UEM Sunrise Gerbang Nusajaya ~350 MW Planning stage (2024–25)
Stack (USA) Johor Bahru 220 MW Phase 1 by late 2026
ZData Technologies Gelang Patah Undisclosed (land acquired) Project expected by late 2025




? Why Johor is attracting data‑center development
• Proximity to Singapore’s submarine‑cable hub, offering low‑latency connectivity for global clients.
• Abundant land, water, and power supply (often coal‑based, but renewable in YTL’s case).
• Streamlined regulatory environment and government support, especially under Johor–Singapore Special Economic Zone goals.
• Massive investments from hyperscalers including Microsoft, Oracle, ByteDance, and others intensify demand for third‑party infrastructure in Johor         .



Let me know if you’d like deeper detail about any specific developer or project timeline—happy to dig into capacity phases, operator strategies, or construction updates.